Pump Program
Session descriptions coming soon!
8:30 - 5:00
Short Course P1/T1: Vibration Problems and Solutions in Pumps and Turbomachinery
Level Three, Room 360A
Level Three, Room 360A
8:30 - 5:00
Short Course P2/T2: Buying and Selling Serial #1
Level Three, Room 330A
Level Three, Room 330A
8:30 - 5:00
Short Course P3: Pumps 101
Level Three, Room 370D
Level Three, Room 370D
8:30 - 5:00
Short Course P4: Fundamentals of Centrifugal Pump and System Interaction
Level Three, Room 370F
Level Three, Room 370F
8:30 - 5:00
Short Course P5: Pump Cavitation – Physics, Prediction, Control, Troubleshooting
Level Three, Room 371D
Level Three, Room 371D
8:30 - 5:00
Short Couse P6: The Effective Use of Sealing Technology to Meet the Ever-Tightening Environmental Regulations
Level Three, Room 371F
Level Three, Room 371F
8:30 - 5:00
Short Course P7: Advanced Mechanical Seals 201 – Demystifying Piping Plans and Support Systems
Level Three, Room 381A
Level Three, Room 381A
8:45 AM
Tutorial P1: An End-User’s Guide to Centrifugal Pump Rotordynamics
Level Three, Room 370F
Also presented on Wednesday at 8:30 AM in Level Three, Room 370F
Level Three, Room 370F
Also presented on Wednesday at 8:30 AM in Level Three, Room 370F
8:45 AM
Tutorial P2: Advancements in Mechanical Sealing – API 682 Fourth Edition
Level Three, Room 371D
Level Three, Room 371D
8:45 AM
Discussion Group P10: Pipeline Applications
Level Three, Room 381A
Level Three, Room 381A
8:45 AM
Discussion Group P11: Subsea Pumps and Drivers
Level Three, Room 371F
Level Three, Room 371F
10:30 AM
Lecture P1: Implementation and Long-step Sensorless Control of Permanent Magnet Synchronous Machines (PMSM) for Subsea Applications
Lecture P2: Experimental Identification of Dynamic Stiffness Coefficients of Long Water-Lubricated Rubber Bearings
Level Three, Room 370D
Lecture P2: Experimental Identification of Dynamic Stiffness Coefficients of Long Water-Lubricated Rubber Bearings
Level Three, Room 370D
10:30 AM
Tutorial P3: Developing a Maintenance Philosophy for Your Plant
Level Three, Room 370F
Level Three, Room 370F
10:30 AM
Tutorial P4: Design of Pump Casings: Guidelines for a Systematic Evaluation of Centrifugal Pump Pressure Boundary Failure Modes and their Mechanisms
Level Three, Room 371D
Level Three, Room 371D
10:30 AM
Discussion Group P6: Mechanical Seals
Level Three, Room 381A
Level Three, Room 381A
10:30 AM
Discussion Group P1/T1: Monitoring Vibration and Other Critical Machine Conditions
Level Three, Room 371F
Also presented Wednesday at 10:30 AM in Level Three, Room 361A
Level Three, Room 371F
Also presented Wednesday at 10:30 AM in Level Three, Room 361A
10:30 AM
Discussion Group P2/T2: Couplings and Alignment
Level Three, Room 361A
Also presented Wednesday at 2:00 PM in Level Three, Room 371F
Level Three, Room 361A
Also presented Wednesday at 2:00 PM in Level Three, Room 371F
10:30 AM
Discussion Group P3/T3: Gears
Level Three, Room 361C
Level Three, Room 361C
2:00 PM
Lecture P3: Effect of Component Interference Fit and Fluid Density on the Lateral and Torsional Natural Frequencies of Turbomachinery Rotor Systems
Level Three, Room 370D
Level Three, Room 370D
2:00 PM
Tutorial P5: Breaking the Cycle of Pump Repairs
Level Three, Room 370F
Level Three, Room 370F
2:00 PM
Tutorial P6: Leakage Detection and Containment Strategies for Single Mechanical Seals
Level Three, Room 371D
Level Three, Room 371D
2:00 PM
Discussion Group P5: Centrifugal Pump Operation, Maintenance, and Reliability
Level Three, Room 381A
Also presented Wednesday at 8:30 AM in Level Three, Room 381A
Level Three, Room 381A
Also presented Wednesday at 8:30 AM in Level Three, Room 381A
8:30 AM
Lecture P4: Design and verification testing of new balance piston for High Boost Multiphase Pumps
Lecture P5: Influence of Impeller Suction Specific Speed on Vibration Performance
Level Three, Room 370D
Lecture P5: Influence of Impeller Suction Specific Speed on Vibration Performance
Level Three, Room 370D
8:30 AM
Tutorial P1: An End-User’s Guide to Centrifugal Pump Rotordynamics
Level Three, Room 370F
Also presented Tuesday at 8:45 AM in Level Three, Room 370F
Level Three, Room 370F
Also presented Tuesday at 8:45 AM in Level Three, Room 370F
8:30 AM
Tutorial P7: Witness Testing of API 610 Centrifugal Pumps and API 611 Steam Turbines
Level Three, Room 371D
Level Three, Room 371D
8:30 AM
Discussion Group P5: Centrifugal Pump Operation, Maintenance, and Reliability
Level Three, Room 381AAlso presented Tuesday at 2:00 PM in Level Three, Room 381A
Level Three, Room 381AAlso presented Tuesday at 2:00 PM in Level Three, Room 381A
8:30 AM
Discussion Group P7: Improving Mean Time Between Pump Failures
Level Three, Room 371F
Level Three, Room 371F
10:30 AM
Lecture P6: High Speed Arrangement 1 Seals in Water Injection Service
Lecture P7: Collection of Field Data Using Wireless Instrumentation for Pump and System Evaluation
Level Three, Room 370D
Lecture P7: Collection of Field Data Using Wireless Instrumentation for Pump and System Evaluation
Level Three, Room 370D
10:30 AM
Tutorial P8: Bearing Maintenance Practices to Ensure Maximum Bearing Life
Level Three, Room 371D
Level Three, Room 371D
10:30 AM
Tutorial P5: Breaking the Cycle of Pump Repairs
Level Three, Room 370F
Also presented Tuesday at 2:00 PM in Level Three, Room 370F
Level Three, Room 370F
Also presented Tuesday at 2:00 PM in Level Three, Room 370F
10:30 AM
Discussion Group P8: Vertical Pump Problems and Solutions
Level Three, Room 381A
Level Three, Room 381A
10:30 AM
Discussion Group P9: Sealless Pumps
Level Three, Room 371F
Level Three, Room 371F
10:30 AM
Discussion Group P1/T1: Monitoring Vibration and Other Critical Machine Conditions
Level Three, Room 361A
Also presented Tuesday at 10:30 AM in Level Three, Room 371F
Level Three, Room 361A
Also presented Tuesday at 10:30 AM in Level Three, Room 371F
10:30 AM
Discussion Group P4/T4: Lubrication
Level Three, Room 361C
Level Three, Room 361C
2:00 PM
Tutorial P9: CO2 Capture and Pumping
Level Three, Room 370F
Level Three, Room 370F
2:00 PM
Tutorial P10: The Evolution of Successful Elimination of Electro-Corrosion in Mechanical Seals for Reactor- and Boiler Feed Water Pumps Handling Ultra-Pure Water
Level Three, Room 371D
Level Three, Room 371D
2:00 PM
Discussion Group P2/T2: Couplings and Alignment
Level Three, Room 371F
Also presented Tuesday at 10:30 AM in Level Three, Room 361A
Level Three, Room 371F
Also presented Tuesday at 10:30 AM in Level Three, Room 361A
2:00 PM
Discussion Group P4/T4: Lubrication
Level Three, Room 361C
Level Three, Room 361C
8:30 AM
Case Study Pump Session 1A
- CSP1: River Water Pump Cyclic Vibration
- CSP2: Resolving Vibration Issues of Diesel Engine Driven Fire Water Pumps
- CSP3: PTFE/Rubber Hybrid Bearings for Dry-Start Vertical Pumps
8:30 AM
Case Study Pump Session 1B
- CSP4: Improving Pump Reliability and Longevity by Running in the Sweet Zone
- CSP5: Elevated Pressure Pulsation in a Methanol Injection Reciprocating Pump System
- CSP6: Boiler Feed Water Pumps Performance Loss
8:30 AM
Case Study Pump Session 2
- CSP7: Separation Seal Upgrade to Overcome Repetitive Failures
- CSP8: Severe Casing and Impeller Erosion: Analysis and Resolution
- CSP9: Hydraulic Upgrade of Hot Water Recirculation Pumps in a District Heating System